EAM Work Orders – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™.

Overview

Enterprise asset management work orders including asset and cost information

Report Parameters

Organization Code, Department, Asset Group, Asset Number, Scheduled Start Date From, Scheduled Start Date To, Work Order Creation Date From, Work Order Creation Date To, Work Order Status, Planner, Work Order Created By, Cost Period from Date, Cost Period to Date, Cost Detail Level

Oracle EBS Tables Used

mtl_system_items_b_kfv, eam_construction_estimates, mtl_parameters, wip_entities, wip_discrete_jobs, org_access_view, bom_departments, pa_projects_all, pa_tasks, eam_work_order_details, eam_wo_statuses_v, eam_pm_schedulings, eam_org_maint_defaults, mtl_eam_locations, csi_item_instances, mtl_categories_b_kfv, eam_failureinfo_v, wip_eam_period_balances, org_acct_periods, gl_periods, wip_eam_cost_details_v

Report Categories

Enginatics, R12 only

Running This SQL Without Blitz Report

Some Oracle EBS SQL reports in this library require functions from the utility package xxen_util. Install it before running the SQL directly against your Oracle EBS database.

Download & Import Options

Resource Link
Excel Example Output EAM Work Orders 18-Jan-2018 152946.xlsx
Blitz Report™ XML Import EAM_Work_Orders.xml
Full SQL on Enginatics www.enginatics.com/reports/eam-work-orders/

EAM Work Orders - Case Study & Technical Analysis

Executive Summary

The EAM Work Orders report provides a comprehensive view of Enterprise Asset Management (EAM) maintenance activities. It serves as a central dashboard for maintenance planners and financial analysts to monitor work order status, schedule adherence, asset performance, and associated costs. By consolidating operational data (dates, statuses, asset details) with financial data (estimated vs. actual costs), this report enables organizations to optimize maintenance schedules, control budget overruns, and improve asset reliability.

Business Challenge

Maintenance organizations often struggle with disjointed data residing in separate modules—work order management, asset tracking, and costing. This fragmentation leads to several challenges:

Solution

The EAM Work Orders report addresses these challenges by delivering a unified view of the maintenance lifecycle. It links work orders directly to the assets they service and provides a detailed breakdown of costs and scheduling metrics.

Key Benefits:

Technical Architecture

The report is built on the Oracle E-Business Suite EAM and WIP (Work in Process) architecture. It primarily queries the WIP_DISCRETE_JOBS table, which stores the header information for maintenance work orders, and joins it with CSI_ITEM_INSTANCES for asset details.

Key Tables & Joins:

Parameters

The report supports a wide range of parameters to filter data for specific analysis needs:

FAQ

Q: How are “Actual Costs” calculated in this report? A: Actual costs are derived from the WIP_EAM_PERIOD_BALANCES table, summing up charges (Material, Labor, Equipment) posted to the work order within the specified cost period.

Q: Can I see work orders that are currently on hold? A: Yes, you can use the “Work Order Status” parameter to filter for specific statuses, including “On Hold” or “Pending”.

Q: Does this report include failure analysis data? A: Yes, the report includes columns for Failure Code, Failure Description, and Cause, provided that failure information was captured on the work order.

Q: Why do some work orders show no asset number? A: Rebuildable work orders or work orders created for general maintenance activities not linked to a specific serialized asset instance might not have an asset number.