Skip to the content.

OPM Batch Details and Status Summary – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™. Oracle EBS module: Process Manufacturing · all Process Manufacturing reports

Overview

Oracle Process Manufacturing (OPM) batch details and status summary: one row per production batch showing batch status and type, recipe, primary product and planned/actual output quantity, planned versus actual start and completion dates, and whether the batch completed on time. Set a pending/released status with plan-date filters for a planned-production view.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Organization Code, Batch Number, Product Item, Batch Status, Actual Start Date From, Actual Start Date To

Oracle EBS Tables Used

gme_batch_header, org_organization_definitions, gmd_recipe_validity_rules, gmd_recipes_vl, gme_material_details, mtl_system_items_vl, org_access_view

Report Categories

Enginatics, R12 only

OPM Batch Yield Variance, OPM Batch Material Usage and Substitution Variance

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output OPM Batch Details and Status Summary 05-Jun-2026 120004.xlsx
Blitz Report™ XML Import OPM_Batch_Details_and_Status_Summary.xml
SQL Source OPM Batch Details and Status Summary.sql
Full Report on Enginatics www.enginatics.com/reports/opm-batch-details-and-status-summary/

Case Study & Technical Analysis: OPM Batch Details and Status Summary

Executive Summary

The OPM Batch Details and Status Summary report lists the production batches of Oracle Process Manufacturing, one row per batch. For each batch it shows the status and type, the recipe and version it was made from, the primary product, the planned and actual output quantity, the planned and actual start and completion dates, and whether the batch finished on or before its planned completion date. Production supervisors and plant planners use it to review batch execution against plan, to confirm which batches are still pending or released, and to report on on-time completion. The report runs in Excel through Blitz Report.

Business Challenge

The Solution

Technical Architecture (High Level)

Primary Tables

Logical Relationships

  1. GME_BATCH_HEADER joins to ORG_ORGANIZATION_DEFINITIONS on the organization ID, restricted to organizations in ORG_ACCESS_VIEW.
  2. An inline view takes the material lines of type 1 (product) and groups them by batch, returning the first product item, the summed planned and actual quantities, and the unit of the first line.
  3. The batch joins to that inline view on the batch ID, and the product item joins to MTL_SYSTEM_ITEMS_VL on item and organization.
  4. The batch joins to GMD_RECIPE_VALIDITY_RULES on the recipe validity rule ID, and that joins to GMD_RECIPES_VL on the recipe ID.
  5. Output is ordered by organization code and batch number.

Parameters & Filtering

Performance & Optimization

FAQ

Q: How is the on-time completion flag determined? A: The flag is Yes when the actual completion date is on or before the planned completion date, and blank otherwise.

Q: Which quantity is shown as the batch output? A: The planned product quantity and the actual product quantity are the sums of the product lines of the batch, in the unit of its first product line.

Q: What is the difference between a Batch and a Firm Planned Order in this report? A: The batch type column shows Batch for batch type 0 and Firm Planned Order for batch type 10.


© Enginatics GmbH