Skip to the content.

PA Project Expenditure Items with WIP and INV Detail – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™. Oracle EBS module: Projects · all Projects reports

Overview

Project expenditure items showing WIP and inventory transaction details including transaction types, quantities, WIP job, assembly, department, resource, and inventory item information.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Operating Unit, Project, Task, Date From, Date To, Expenditure Type, Expenditure Type Class, Job, Employee

Oracle EBS Tables Used

pa_project_statuses, pa_system_linkages, pa_transaction_sources, pa_expenditure_items_all, pa_expenditures_all, pa_expenditure_types, pa_projects_all, pa_tasks, hr_all_organization_units_vl, per_people_x, wip_transactions, wip_entities, wip_discrete_jobs, wip_repetitive_items, mtl_system_items_vl, bom_departments, bom_resources, mtl_material_transactions, mtl_transaction_types, mo_glob_org_access_tmp, dual

Report Categories

Enginatics, R12 only

GL Account Analysis, GL Account Distribution Analysis, GL Account Analysis (Drilldown) (with inventory and WIP), AP Invoices and Lines, PA Employee Activity By Organization, GL Account Analysis (Drilldown), GL Account Analysis 11g, PA Cost Audit

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output PA Project Expenditure Items with WIP and INV Detail 23-Mar-2026 081847.xlsx
Blitz Report™ XML Import PA_Project_Expenditure_Items_with_WIP_and_INV_Detail.xml
SQL Source PA Project Expenditure Items with WIP and INV Detail.sql
Full Report on Enginatics www.enginatics.com/reports/pa-project-expenditure-items-with-wip-and-inv-detail/

Case Study & Technical Analysis: PA Project Expenditure Items with WIP and INV Detail

Executive Summary

This report lists Oracle Projects expenditure items together with the manufacturing transaction behind each item where one exists. For an item raised from Work in Process it shows the WIP transaction, job, assembly, department and resource, and for an item raised from Inventory it shows the material transaction, its type, item and quantity. Project controllers use it to trace project costs back to the shop floor job or inventory movement behind them. It is an R12 report that runs in Excel through Blitz Report™.

Business Challenge

The Solution

Technical Architecture (High Level)

Primary Tables

Logical Relationships

  1. Each expenditure item joins to its header, expenditure type, project, task and accessible operating unit.
  2. The WIP transaction is found by converting the original transaction reference to a number, and only for items whose linkage function is WIP and whose transaction source is Work In Process.
  3. The WIP entity of the transaction or material transaction identifies the job, and its primary item gives the assembly.
  4. The inventory material transaction is found by the same conversion, for WIP or INV linkages whose source is not Work In Process.
  5. Department and resource are joined to the WIP transaction and to the expenditure item’s WIP resource.
  6. The results are ordered by operating unit, project number, task number and expenditure item date.

Parameters & Filtering

Performance & Optimization

FAQ

Q: How is a project expenditure item matched to its WIP transaction? A: The report converts the original transaction reference of the expenditure item to a number and matches it to the WIP transaction identifier, for items whose linkage function is WIP and whose source is Work In Process.

Q: Which items show an inventory transaction? A: Items whose linkage function is WIP or INV, and whose transaction source is not Work In Process, show the matching material transaction, its type, date, item and quantity.

Q: Can an item be listed without a manufacturing transaction? A: Yes, the manufacturing joins are outer joins, so items that have no WIP or inventory transaction are still listed with blank manufacturing columns.


© Enginatics GmbH