Skip to the content.

PA Project Revenue and Cost by Period – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™. Oracle EBS module: Projects · all Projects reports

Overview

Revenue, raw cost, burdened cost and margin per project and top task for each GL or PA period, in the project functional currency.

Cost is taken from the raw cost distribution lines of all expenditure items, revenue from the released draft revenue of expenditure items and events. Period Basis decides whether amounts are assigned to periods by their GL date and the ledger’s accounting periods, or by their PA date and the PA periods. A date range that starts or ends inside a period includes only part of that period.

Event revenue entered at project level shows a blank top task. Run over all periods, the totals agree with the inception-to-date actuals of Update Project Summary Amounts as of its last run.

The templates Pivot: by Period and Pivot: by Year show projects against periods or fiscal years.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Operating Unit, Project Type, Project Status, Project, Period Basis, Date From, Date To

Oracle EBS Tables Used

pa_cost_distribution_lines_all, pa_tasks, pa_draft_revenues_all, pa_cust_rev_dist_lines_all, pa_expenditure_items_all, pa_cust_event_rdl_all, pa_projects_all, hr_all_organization_units_vl, pa_project_statuses, pa_implementations_all, gl_ledgers, gl_periods, mo_glob_org_access_tmp, dual

Report Categories

Enginatics

GL Account Distribution Analysis, GL Account Analysis (Drilldown) (with inventory and WIP), GL Account Analysis, XLA Distribution Links Summary, GL Account Analysis (Drilldown), GL Account Analysis 11g

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output PA Project Revenue and Cost by Period 21-Oct-2026 031539.xlsx
Blitz Report™ XML Import PA_Project_Revenue_and_Cost_by_Period.xml
SQL Source PA Project Revenue and Cost by Period.sql
Full Report on Enginatics www.enginatics.com/reports/pa-project-revenue-and-cost-by-period/

© Enginatics GmbH