Skip to the content.

WIP Move Transactions – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™. Oracle EBS module: Work in Process · all Work in Process reports

Overview

WIP move transactions of discrete jobs, lot based jobs, repetitive schedules and flow schedules, one row per transaction, as shown in the View Move Transactions form.

The report covers the data of the Oracle standard Move Transaction Report (WIPTSMOV): from and to operation, department and intraoperation step, transaction and primary quantity, reason and reference, over-completion, scrap account and the employee who performed the move.

A repetitive move is shown once per repetitive schedule it was allocated to, with the schedule’s first unit start date and the allocated quantity.

Quantity is in the unit of measure the transaction was entered in, Primary Quantity in the assembly’s primary unit of measure. Transaction Day is the transaction date without the time, for daily totals.

Transactions still pending in the move transaction interface are not included.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Organization Code, Date From, Date To, Job, Line, Assembly, From Department, To Department, From Step, To Step, Reason, Employee Number

Oracle EBS Tables Used

mtl_parameters, wip_move_transactions, wip_move_txn_allocations, wip_repetitive_schedules, wip_entities, wip_lines, mtl_system_items_vl, bom_departments, mtl_transaction_reasons, per_all_people_f, org_access_view

Report Categories

Enginatics

WIP Move Transactions 11i, GL Account Analysis, GL Account Distribution Analysis, GL Account Analysis (Drilldown) (with inventory and WIP), MRP Pegging

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output WIP Move Transactions 14-Oct-2026 104342.xlsx
Blitz Report™ XML Import WIP_Move_Transactions.xml
SQL Source WIP Move Transactions.sql
Full Report on Enginatics www.enginatics.com/reports/wip-move-transactions/

Case Study & Technical Analysis: WIP Move Transactions

Executive Summary

The WIP Move Transactions report lists the work in process move transactions of an organization, one row per transaction, as shown in the View Move Transactions form. It covers discrete jobs, lot based jobs, repetitive schedules and flow schedules. Each row shows the operation and department the assembly moved from and to, the intraoperation step, the quantity moved in the entered and primary units, any over-completion and scrap account, the reason and reference, and the employee who performed the move. Production supervisors and cost accountants use it to review shop floor activity by day, to trace quantities through operations, and to investigate scrap and over-completion. The report runs in Excel through Blitz Report.

Business Challenge

The Solution

Technical Architecture (High Level)

Primary Tables

Logical Relationships

  1. MTL_PARAMETERS joins to WIP_MOVE_TRANSACTIONS on the organization ID, restricted to organizations in ORG_ACCESS_VIEW.
  2. Each move joins to its allocations as an outer join, so moves that are not repetitive are kept once.
  3. The allocation joins to WIP_REPETITIVE_SCHEDULES on the schedule ID, as an outer join.
  4. The move joins to WIP_ENTITIES on the job ID, to WIP_LINES on the line ID, and to MTL_SYSTEM_ITEMS_VL on the primary item.
  5. The from and to departments join to BOM_DEPARTMENTS, the reason to MTL_TRANSACTION_REASONS, and the employee to PER_ALL_PEOPLE_F by a transaction date that falls within the person’s effective dates.

Parameters & Filtering

Performance & Optimization

FAQ

Q: Why does one move appear more than once? A: A repetitive move is shown once for each repetitive schedule it was allocated to, with the allocated quantity and the first unit start date of that schedule.

Q: What is the difference between Quantity and Primary Quantity? A: Quantity is in the unit of measure the transaction was entered in, and Primary Quantity is in the primary unit of measure of the assembly.

Q: Which transactions are not in the report? A: The description states that transactions still pending in the move transaction interface are not included.


© Enginatics GmbH