Overview

Capital project asset information showing CIP costs, capitalized amounts, FA asset numbers, estimated and actual in-service dates, and asset line transfer status.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Operating Unit, Project

Oracle EBS Tables Used

pa_project_statuses, fa_additions_b, pa_capital_events, pa_project_assets_all, pa_projects_all, pa_project_asset_lines_all, hr_all_organization_units_vl, mo_glob_org_access_tmp, dual

Report Categories

Enginatics

PA Project Upload, PA Project Revenue and Cost by Period, PA Project Asset Upload, PA Budget Upload, ONT Orders and Lines, ONT Orders and Lines 11i, GL Account Analysis, AP Invoices and Lines

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output PA Project Asset Details 07-Apr-2018 145706.xlsx
Blitz Report™ XML Import PA_Project_Asset_Details.xml
SQL Source PA Project Asset Details.sql
Full Report on Enginatics www.enginatics.com/reports/pa-project-asset-details/

Case Study & Technical Analysis: PA Project Asset Details

Executive Summary

The PA Project Asset Details report lists the capital project assets of Oracle Projects. For each project asset it shows the CIP cost, the capitalized amounts, the Oracle Assets asset number, the estimated and actual in-service dates and the transfer status of each asset line. Capital project accountants and project controllers use it to follow construction in progress through to capitalization, to find assets that have not yet been transferred to Oracle Assets and to check the in-service dates of completed projects. It runs in Excel through Blitz Report, which allows the cost columns to be summed by project and operating unit.

Business Challenge

The Solution

Technical Architecture (High Level)

Primary Tables

Logical Relationships

  1. PA_PROJECT_ASSETS_ALL is joined to PA_PROJECTS_ALL on the project id, which gives the project number and name.
  2. PA_PROJECT_ASSET_LINES_ALL is outer joined to the project asset on the project asset id, so an asset with no cost lines still appears.
  3. The Oracle Assets asset number is a scalar lookup on FA_ADDITIONS_B through the FA asset id of the project asset.
  4. The capital event number comes from PA_CAPITAL_EVENTS on the capital event id of the asset line.
  5. The operating unit is joined from the project’s organization id to HR_ALL_ORGANIZATION_UNITS_VL, and restricted to the organizations of MO_GLOB_ORG_ACCESS_TMP.

Parameters & Filtering

Performance & Optimization

FAQ

Q: How do I find project assets that are not yet transferred to Oracle Assets? A: Run the report and look at the Asset Line Transfer Status column. Lines that are not yet transferred show a status other than transferred, and the FA Asset Number is blank until the asset exists in Oracle Assets.

Q: Which cost is shown for a project asset? A: The report shows the original asset cost and the current asset cost of each asset line, with the capital event number that created the cost.

Q: How do I see when a project asset was placed in service? A: The Estimated In-Service Date and Date Placed In Service columns show the planned and the actual date, and the Capitalized Date shows when the asset was capitalized.