Skip to the content.

PA Project Subledger Detail by Expenditure Type – Oracle EBS SQL Report

Oracle E-Business Suite SQL report from the Enginatics Library powered by Blitz Report™. Oracle EBS module: Projects · all Projects reports

Overview

Cost distribution lines summarized by project, task, expenditure type, and GL account showing raw cost, burden cost, and total cost for transferred and accepted lines.

Run this report in Excel in seconds: download Blitz Report™ free (your first 30 reports are free) or try it in the online demo.

Report Parameters

Operating Unit, Project, GL Date From, GL Date To, Expenditure Type, Account

Oracle EBS Tables Used

pa_cost_distribution_lines_all, pa_expenditure_items_all, pa_projects_all, pa_tasks, pa_expenditure_types, gl_code_combinations_kfv, hr_all_organization_units_vl, mo_glob_org_access_tmp, dual

Report Categories

Enginatics

PA Supplier Invoice Audit, PA Cost Audit, AP Distribution Set Listing, PA Project Revenue and Cost by Period, AP Expense Report Upload, AP Distribution Set Upload, WIP Account Distribution, PA Project Expenditure Items with WIP and INV Detail

Running This SQL Without Blitz Report

The SQL source can be run in any SQL client. Some Oracle EBS SQL reports in this library use functions from the utility package xxen_util – install it first. Blitz Report™ adds parameters, Excel output with pivots, scheduling and security on top.

Download & Import Options

Resource Link
Excel Example Output PA Project Subledger Detail by Expenditure Type 04-Apr-2026 023352.xlsx
Blitz Report™ XML Import PA_Project_Subledger_Detail_by_Expenditure_Type.xml
SQL Source PA Project Subledger Detail by Expenditure Type.sql
Full Report on Enginatics www.enginatics.com/reports/pa-project-subledger-detail-by-expenditure-type(1)/

Case Study & Technical Analysis: PA Project Subledger Detail by Expenditure Type

Executive Summary

The PA Project Subledger Detail by Expenditure Type report summarizes the project cost distribution lines of Oracle Projects by project, task, expenditure type and General Ledger account. For each group it shows the raw cost, the burden cost and the total cost of the lines that have been transferred or accepted. Project accountants use it to reconcile the costs held in Projects with the GL account balances they have been posted to, and to explain the burden applied to each expenditure type. The report runs in Excel through Blitz Report, so the reconciliation can be filtered by GL date and account.

Business Challenge

The Solution

Technical Architecture (High Level)

Primary Tables

Logical Relationships

  1. PA_COST_DISTRIBUTION_LINES_ALL joins to PA_EXPENDITURE_ITEMS_ALL on the expenditure item ID.
  2. The expenditure item joins to PA_PROJECTS_ALL on the project ID, to PA_TASKS on the task ID, and to PA_EXPENDITURE_TYPES on the expenditure type.
  3. The distribution line joins to GL_CODE_COMBINATIONS_KFV on the debit code combination ID, as an outer join so that lines without an account are kept.
  4. The project joins to HR_ALL_ORGANIZATION_UNITS_VL on the organization ID, which is the operating unit.
  5. The rows are grouped by operating unit, project, task, expenditure type, category, system linkage, GL account and account description, and ordered by the same keys.

Parameters & Filtering

Performance & Optimization

FAQ

Q: Which cost lines are included in this report? A: Cost distribution lines of line type R whose transfer status is A (accepted) or V (transferred).

Q: How is total cost calculated? A: Total cost is the raw cost plus the difference between the burdened cost and the raw amount, so it equals the burdened cost where a burden is applied.

Q: How can I reconcile this report to the General Ledger? A: Compare the total cost for each GL account with the project cost in the GL account balance for the same period, using the GL Date From and GL Date To parameters.


© Enginatics GmbH